Loading...
VERONA TANGENTIAL VERONA – ROAD PARKING PITCHES2019-03-07T10:29:54+00:00

VERONA TANGENTIAL VERONA – ROAD PARKING PITCHES

TItaly- South Bypass of Verona

South Bypass of Verona – new road lay-by

The structures in question are constituted by four walls of scarp for the realization of the same number bys without modification of the impression of the road embankment and of the expropriations. The walls have variable heights from 1.40 to 4.00 m and have a linear development of about 392 m, varying for different works from 90 m to 103.5 m.

Muro in TV - S.V Lioni Grottaminarda foto 2
Muro in TV - S.V Lioni Grottaminarda foto 4

SURFACE

1.200 m2 of reinforced soil in vertical facing with concrete panels.

ENTERPRISE

THIENE Costruzioni S.r.l. – Longare (VI).

PLACE

Verona – Italy

EQUITER SRL – SPECIALISTS IN ARMED EARTH AND GREEN EARTH

PROFESSIONALISM, COMPETENCE AND RELIABILITY


VERONA TANGENZIALE EST
EQUITER SRL
ROAD PARKING PITCHES
ITALY-VERONA
+39 068177632
info@equitersrl.eu
Call Now Button